Working as the rear-end distributed power unit, Seaboard System 1982 shoves on the hind-end of train I14009 shortly after daybreak, crossing West Point Lake on the Chattahoochee River near LaGrang... (more)
A Saturday extra run for St Marys Railroad crosses the St Marys River out of Kingsland, GA, into Florida, to deliver a cut of freight cars to the First Coast Railroad at Yulee.
The first AC44C6M rebuild leads a Charlotte, NC to Memphis, TN/BNSF run-through over the distinctive concrete arch bridging Sweetwater Creek. With almost 650 AC44C6M's, NS must really like them e... (more)