CN 302 clears a major detector in the north Mississippi Delta between Lake Cormorant and Banks.
CSX GP40-2 6245 leads train B724 across through the Sterling Swamp as it waddles up the Fitchburg Secondary towards Leominster as the very last light of this late October afternoon illuminates the... (more)
Aerial tree trimming along the New England Central is currently underway. The project will take the crews from Vernon VT to Saint Albans VT and is expected to take three months.
Union Pacific autorack No. ETTX No. 801625 is in the final process of being rebuilt at the railroad’s car shop at De Soto, Missouri, on September 28, 2011. After painting and lettering of the fi... (more)