The mountains of Tibet, where a new railway was opened in july 2006. This train is headed for Chengdu, 3.360 km and 46 hours away. The highest point on the Tibet line is at 16.640 feet (5.072 m) - a new world record. The locomotives of type GE C38AChe are built by General Electric in Pennsylvania, USA.