The second revenue run to Saratoga rolls SB thru the interlocking at CPC-37. The train is rolling down the Station Track onto the S&NC controlled trackage at the station at 5:54PM. CP refers to these trains as SNCR plus the date when CP moves them off the Adirondack Branch at CPC-38 and into the Station Track at CPC-37.