A large "Combilift" crane is moving the cab modul of the new "Giruno" train from Stadler Rail for the SBB in Erstfeld. The SBB ordered 29 of this highspeed trains for 250 km/h, mainly for the traffic Zürich-Milan through the new Gotthard and Ceneri Base tunnels. This cab modul with simulator will be showed to the public during the opening event of the GBT on june 4th/5th.