Rio Grande GP9s No. 5904 and 5922 set out a long cut of drop bottom gondolas in the former Columbia Steel Co. yard at Ironton on May 21, 1983. Spanish Fork Canyon, where a giant mudslide shut down the D&RGW mainline, blocked the river, and Highway 6 four weeks earlier is in the background above the first and second gondola cars.