With snow still on the top of the San Francisco Peaks in May, a heavy Los Angeles Harbor stack train slowly rolls into Winslow, AZ. After making the 295 mile long trip from Needles, CA to the crew changing point of Winslow, AZ, the crew of this S LHTCLO2 will disembark and let a new crew take the train to Belen, NM.