A pair of non-LNG GEVOs bring a long and heavy Hialeah to Jacksonville mixed freight north. With 90 loads of aggregate and cement ahead of empty intermodal, empty autoracks, half an empty ethanol and general freight, the engineer has to deal with a lot of slack on this 10,224' train.