Stacking ’em up With a long trackwork window on Mullan Pass during the day, westbound trains began to stack up on Montana Rail Link’s Second Subdivision, including at the crew change point of Helena. In front of the depot, four trains wait to head west on the afternoon of June 29, 2017. BNSF GE ES44DC No. 7684 will led the pack west with a manifest freight.
GE manufactured safety cab locomotives, refer to https://en.wikipedia.org/wiki/List_of_GE_locomotives for a complete list.
NOTE: This album includes photos of modern GE passenger locos.