Out of the Darkness: After waiting almost 45 minutes for a BNSF track gang to clear their track-and-time, UP 4014 slowly emerges from the St. Paul tunnels on main track 2. They will pull through Division St, shove down the "depot track," past Robert St interlocking, and pull into SPUD. This move happened a couple times during the Twin Cities visit, mainly due to the concern of UP 4014's tender successfully negotiating the double-slip switch at the East end of the station. Taken while off duty, wearing full PPE.