On the second day of "Giruno" services through the Gotthard Base Tunnel, IC 675 of the line IC21 from Basel via Lucerne to Lugano, arrived in Belllinzona, with RABe 501 # 006 and # 008 in multiple traction, forming a 404 meter long train with 810 seats.