"Giruno" highspeed train (maximum velocity 250 km/h/155 mph) RABe 501 # 016 of the SBB, built by StadlerRail in a series of 29, is leaving the 57 kilometer long, world record, Gotthard Base Tunnel (GBT) at Rynächt near Erstfeld at 160 km/h, running as IC 882 of the line IC 2 from Lugano via Bellinzona-Flüelen-Arth Goldau-Rotkreuz-Zug to Zürich.