The tail end of the loaded coal train, under the bridge going east, will shortly become the front of the train heading south. NS 4000 and 4001 will couple onto the train and take the connecting track, just beyond the bridge, and head south on the southern end of the Shenandoah Division/Winston-Salem District. Their destination is the Belews Creek Power Station at Belews Creekl NC just north of Winston-Salem NC.