Three BNSF C44-9Ws bring a BNSF grain empty over the long bridge spanning an arm of Lake Pend Oreille between Algoma and Sandpoint, Idaho, on February 3, 2022. BNSF’s is constructing another new bridge parallel to this one on the west side of the current bridge and is not visible from this angle, but is noted by the large crane in the background.