Handle with care: A "high profile" load on the WW&F - Part 7. Having arrived at its destination at Top of the Mountain, our train begins the switching moves required to park the load on the industrial siding. With the first idler flat removed, WW&F #9 now brings the load onto the industrial siding at Top of the Mountain Station, where it will sit for a few weeks, until some site preparations can be done. Then, a large crane will be brought in to remove the shelter from the flat car and place it in its final location.