Three lite engines speed down the KD Sub on a bright and sunny November morning. The engines are on their way to the big Kopper Glo mine to load mtys left under the concrete silo before the holiday.
Looking back down memory lane at the last generation of GE spartan cab which includes the six axles C series and four axles B series throughout the various of Class 1 Railroads in North America throughout the years.