DXB5074 rolls out of the Waitakere tunnel with a load of plantation timber from Whangarei. Thanks to John Russell for filling in the details on this working!
Trains on 3' 6" (1.067m) track from Whangarei to Bluff with virtually heritage rebuilt EMD and GE locomotives still the mainstay power. The network was privatized in 1990's and operated by Toll until 2008 when state owned KiwiRail was established.