Cogwheel diesel locomotive HGm 2/2 # 51 of the steam railroad Furka Bergstrecke is on its way to Realp with crane wagon X # 2941 "Bruno" through the Furkareuss gorge above the 36 meter long Alt Senntumstafel Tunnel I, passing a yellow Nencki crawler excavator. In the last few days, the snow clearing crew has milled out a deep trench through avalanche snow to open up the track. On this day, the Steffenbach bridge was rebuilt, which is folded down during the winter to allow the avalanches a clear path. The summer season will start on june 20th.