319.305 and 319.308 with a rail train ready to be unloaded in the construction of the high speed line between Ourense and Santiago de Compostela (a section of Madrid - Northwest line).
Renfe 81225 loaded with wood passes under the Portos river viaduct (new high speed line Ourense-Santiago) where a rail train is ready to be unloaded.