It's a beautiful spring morning as UP 7366 and UP 6455 grind up the hill out of the Cienega Creek canyon with an eastbound doublestack.
Union Pacific 5553 and UP 4961 lead an eastbound doublestack up the new line relocation near the old Empirita horseshoe curve. The new line parallels Interstate 10 and is located between the Cien... (more)
NS 9618, NS 6739, NS 9526, and NS 8848 power a Union Pacific doublestack train east up the new line relocation near the Empirita horseshoe curve. This new line location is between the Cienega Cree... (more)
A major derailment on BNSF's Transcon in Northern Arizona has forced the detour of hot pig trains onto the the UP's Sunset Route, like 4625 East coming through this horseshoe curve on Number Two T... (more)
Sitting beside the overpass waiting on the number two track to make it self known, my hand were frozen and my shoes wet, my thin Arizona blood was starting to put up a fit. But i held on to captur... (more)
A UP intermodal moves through Marsh, having just come out of the tight horseshoe curve.
A auto train in Marsh moves east having just come out of the tight horseshoe curve
With the Tucson Mountains in the distance, an eastbound UP manifest grinds upgrade on No. 2 track east of Empirita at dusk as it struggles to reach the summit at Mescal.
Ex-SP SD40T-2 2852 leads an eastbound stack train up No. 2 track with the snow-laced Empire Mountains in the distance.