After Vermont Rail System's Saturday slurry (and salt) train 263-08 required a 6-unit consist to move 63-cars and 8,190 tons up the nearly 2% grade from Rutland to Bellows Falls, the consist retur... (more)
Vermont Rail System's Saturday slurry (and salt) train 263-08 required a 6-unit consist to move 63-cars and 8,190 tons up the nearly 2% grade from Rutland to the summit of the Green Mountains at M... (more)
On January 19 and 20, a major winter storm dumped as much as 2 feet of new snow across the Green Mountain Railroad's Bellows Falls Subdivision. Vermont Rail System responded to the storm by dispa... (more)
On January 19 and 20, a major winter storm dumped as much as 2 feet of new snow across the Green Mountain Railroad's Bellows Falls Subdivision. Vermont Rail System responded to the storm by dispa... (more)