The DPU on N312, coal loads for Duke Energy's Cliffside Steam Station on the Brice Spur, crosses the Toe River and passes the elderly Clinchfield signal at NE Toe River.
On it's inaugural mainline run, CSX's First Responders Unit leads freight train Q693 south down the Clinchfield Loops as it pops out of the 2,211 ft. Lower Pine Ridge Tunnel and will enter the 341... (more)