CLF3-BRM002-BRM001 with an empty SSR grain train to western Victoria cross the Maribyrnong River bridge at Footscray.
CLF3-G514-BRM001 with an empty SSR grain train to northwestern Victoria at Laverton.
Freshly repainted CLF3-G514 prepare to attach to an SSR grain rake at Appleton Dock.
CLF2-C501-CSR007 with 7922V up Dooen freight pass through West Footscray at sunset.
CLF2-X31-C501 with 7922V up Dooen freight approach Newport.
CLF2-X31-C501 with 7922V up Dooen freight at Newport.
CLF2-X31-C501 with 7922V up Dooen freight at Spotswood.
CLF2-X31-C501-CSR004 power through Brooklyn with 7922V up Dooen freight.
CLF3-S311-CLP12 pass through Sunshine with an empty SSR grain to NSW.
CLF4-CLP12-C501-CLF1 coast through Albion with a loaded SSR grain train from NSW to Appleton Dock.
CLF1-C501-CLP12-CLF4 with 7MC7 empty grain to NSW at Albion.
CLF1-C501-CLP12-CLF4 approach Jacana with 7MC5 empty SSR grain to NSW.
CLF1-C501-CLP12-4814 shunt an SSR grain consist at Appleton Dock.
CLF1-C501-852-CLP12 with an empty grain train from North Geelong approach Newport.
CLF1-4814-C501-BRM001-852 power through West Footscray with 2MC5 empty SSR grain to NSW.