The spray train heads east through Marathon touching up some spots as they pass the tie gang waiting their block.
CP 100 splits the plant at Marathon West with 12000ft of stacks
CP 112 gets a good reading from the hotbox as they ease into Marathon taking the siding to meet 101's train.
West of Marathon, CP's mainline enters the rocky north shore of Superior. CP 101 begins to snake its way through, the track speed drops from 50 to 35 ahead.
Vancouver, BC - Toronto, ON stacker #100 cruises through Marathon behind a rebuilt AC4400CW.
After picking up three gondolas from the storage track, train 420 is on its way through town on a quiet Thursday morning
CP 118 passes through Marathon as smoky skies from several fires in Northwestern Ontario linger in the air. With a south wind off Superior, the smoke is pushed inland.
CP AC44's 8151 + 9823 have 113's train in check heading west through Marathon
CP 420 eases into Marathon to meet 113's freight
The shoulder cutter heads east to work between Marathon & Heron Bay for the evening
CP AC4400CWM 8173 + CP AC4400CW 9728 pull 118's freight into Marathon
Factory fresh rebuild 8173 pulls Edmonton, AB - Montreal, PQ intermix #118 along Lake Superior passing Carden Cove
In the late afternoon a Vancouver Deltaport, BC - Toronto Yard, ON stack train makes its way down the main at Marathon
Montreal - Vancouver #113 blasts through Marathon on a beautiful and quiet Monday morning
CP 113's heads through the rugged landscape on the north shore of Superior.