Amtrak 523 shoves ballast train KP104 as it spreads ballast on the newly laid concrete ties on Track 1 at Cornwells Heights
SEPTA R7 Trenton Local 738 with Budd Silverliner II 266 leading. 266 is equipped with catenary inspection cameras mounted above the cab and in the middle of the car.
Amtrak Train 91 The Silver Star at Eddington Station passes the Amtrak Tie Laying Machine with Amtrak GP38-2 722 on the head end
SEPTA R7 Trenton Local 733 pulls up to temporary platform as Amtrak 720 waits on the head end of the Tie Laying Machine
Amtrak 180 with double-headed AEM-7AC 940 and 944 at Eddington Station
NS 25A at Eddington Station
Amtrak Train 91 The Silver Star at Eddington Station
Amtrak Train 20 The Crescent at Eddington Station
Amtrak Train 41 The Three Rivers at Eddington Station
Amtrak Train 91 The Silver Star passes Amtrak Electric Traction Catenary Maintenance Car A16502 at Eddington Station
FJ10 heads east on Track 3 while MOW personnel work on switch at Eddington. Due to tie replacement on Track 1, FJ10 must run up to Grundy from Holmes, then reverse into the OOS Track 1 area to ser... (more)