These massive wind blade loads demonstrate their maneuverability atop drawbar connected 89’ flats as they head through the east leg of Pueblo Junction. Once this train is entirely on the BNSF m... (more)
With the exception of the BNSF H1 paint scheme, all other variations the post-merger paint scheme with BNSF letters on the long hood are seen on this set power resting in Pueblo one morning.
Sitting on hump track #3 is a familiar face from the Southeast, CSXT 754, who is the rear most DPU on a loaded coal train. This unit coal load is awaiting a new crew to take it just few miles from... (more)