A Rapid Load Shifter rattles through the cut marking the Deane Connection which tied the L&N and C&O together after the formation of CSX. The loaded hoppers below are in the old L&N Hendrix yard ... (more)
After a crew change, mine reassignment and two hour wait at Rapid Load, a Hazard-based mine run rolls DEEX mtys north past the Democrat Loadout on the trip up to the big Buckeye Mine on the EK Sub... (more)
If it's April it must be raining. A Rapid Load Shifter out of Martin crest the heavy grade up to Beaver Gap on the E&BV Subdivision with mtys for the mine.