The RS 60 has finished switching the back track. New Garbage customer Emjay Environmental.
GP38-2’s 268 & 271 with 20 stone hoppers for Brookhaven Rail Terminal passing thru the LIRR Brentwood Station on the Ronkonkoma Branch.
The crew has changed ends in a reverse move thru LD Siding. The LIRR Greenport Scoot has passed AH Block Limit on its return run to Ronkonkoma. The RS 60 will switch Paraco in Riverhead and Sherwo... (more)
The crew is pulling one empty reefer from DiCarlo Foods. The spur was constructed by LIRR track workers in 2005-2006.
The crew is reassembling the train for pull-pull operational at MP 59. The trip to Riverhead for the Paraco switch will be a quick one. No waiting for the Greenport Scoot at LD Block-Limit.
"WAITING FOR THE SWITCH TO BE CLEANED" RS 60 starting off the day waiting for snow removal by LIRR Work crew. The snow is above the rail head. 18” of snow for this snow storm.
Jay Eichler Conductor on the ground directing Engineer Don Carman into Pine Are DEF. Satikos Parkway is seen in the distance above the tracks.
The crew is pulling around the Metro Fuel display train on the passing siding at the former Grumman site. See Railpictures Photo Id 422853 for picture of display train.They will push the display t... (more)
GP38-2's 271 & 261 pushing the display train up to the LIRR Main along Connecticut Avenue. This display was for the grand opening of Metro Fuel Oil at Calverton Enterprise Park. The display train ... (more)
NYAR MP15AC's 151 and 159 painted in their new paint scheme. The crew of the RS 60 will wait for the LIRR passenger train to pass heading east to Riverhead. They will proceed to Holtsville to the ... (more)
GP38-2 270 and MP15AC 151 pulling four empties from Elm Freight. Pallets of flour for Azteca Milling are seen on the platform.
GP38-2 271 has two empty center beams from the Southold team track. The return trip had 271 LHF. RS 60 heading east out of LD siding in LD Block and then will reverse westbound back to Pine Aire.