The crew of the Aberdeen, Carolina & Western Railway has brought their train into downtown Aberdeen as they flag the final crossing before the CSX Interchange. The shiny ACWR power is peeking aro... (more)
The crankcase cover is being removed so that the gaskets can be replaced.
During a 92 day inspection, the brushes on the turbo lube pump were found to be in need of replacement. Mr. April gets cozy with the pump to make the repair.
During the 92 Day Inspection, one of ACWR's Locomotive Specialists, Rob Dickson (AKA Mr. April), inspects the batteries for proper fluid levels.
During the 92 Day Inspection, leaking from the crank case cover was found. One of ACWR's Locomotive Specialists, Rob Dickson (AKA Mr. April), preps the cover for a new gasket.
After putting its train together, a pair of locomotives in AC&W's attractive paint scheme get rolling out of Star en route to the CSX interchange in Aberdeen. A stop will be made at Candor to swit... (more)