DGNO Garland Turn power will be on duty later in the evening for the return trip to Dallas Cadiz yard.
DGNO 3418 throttles up, and with a friendly wave the train disappears into the Dallas skyline.
This power duo will run the DGNO Garland turn today as they wait for the UP dispatcher to give them the Green Signal to get there train at Cadiz yard. UP Dallas sub.
DGNO Garland turn
DGNO Garland Turn power
DGNO Miller turn arriving Miller yard crossing the Trinity River.
DGNO Miller turn heading back to Mockingbird yard
Miller turn working Cadiz.