A long dual-track install train heading east to Roanoke and then on to next assignment at Lamberts Point.
Westbound past hills waiting for Spring.
Rolling through late summer in Southwest Virginia.
With leaves flying beneath the wheels, the right-of-way says autumn.
Three F Units have no problem moving the three-car Special toward Roanoke.
Maintenance train returning to yards in Bristol
Eastbound
Westbound heading into Bristol
Drifting downgrade toward Bristol.
Eastbound 3 car local.