A westbound B&O manifest exits Stuart Tunnel at Magnolia, WV on April, 16, 1978, led by WM GP40 No. 3795. At this point in time, WM operations had been integrated into the B&O and WM units on the... (more)
A westbound B&O manifest exits Stuart Tunnel at Magnolia, WV on October 21, 1979. At over 3,000 feet, Stuart is the longest of the four tunnels on the Magnolia Cut Off. It was also the most prob... (more)