97302 (with 97303 at the other end) sits at Barmouth having arrived with the 20:09 Machynlleth Carriage Sidings structure gauging train which ran as far north as Harlech before returning south, an... (more)
97302 (with 97303 at the other end) sits at Harlech having arrived with the 20:09 Machynlleth Carriage Sidings structure gauging train. It then reversed direction and headed back south, and onward... (more)
97302 (with 97303 at the other end) sits at Harlech having arrived with the 20:09 Machynlleth Carriage Sidings structure gauging train. It then reversed direction and headed back south, and onward... (more)
An especially rare working on the former OWW line. The driver looks back to check the points before reversing. This line is all but abandoned now so it was a delight to find a brave loco traversin... (more)
Network Rails NMT (New Measurement Train) is a converted High Speed Train chock full of hi-tec computerised gadgetry which enable it to use lasers to inspect the track at 125mph.The train,known as... (more)