Cane 1 brings loads back toward the mills in Clewiston. Note the "LED" headlamps. Sugar season runs to April and the "giant model railway" will be in action through then.
Cane 1 returns for the mill as the cane field burns behind the train. The burning of the cane fields is part of the harvesting process, burning off parts not used to make sugar.
506 picks up sugarcane cars at Belle Glade loading point
304 crosses Evercane Rd on what I believe is called the 'U Line' with a load of sugarcane for Clewiston, 24 Nov 2017
A USSC/SCFE GP11 sits at the lines yard/shops in Clewiston, framed by some location appropriate foliage.
US Sugar power is parked outside of the SCFE shops in Clewiston, FL.
Getting ready to take three cars East.
A U.S. Sugar train (South Central Florida Express) returns to Clewiston at sunset after a 14-mile trip to serve the one non-sugar customer on the railroad. It is crossing one of the many canals th... (more)
A well loaded train of sugar cane heads back to the mills at Clewiston .
9027 makes plenty of noise as it climbs the bank past Sugarton with a loaded train of sugar cane heading for the mills at Clewiston .