CPs 8WWA ballast train rumbles over the wooden Crawfish River bridge on a cold and windy spring afternoon. Todays train sports a trio of six-axle EMDs.
With 50-60 loads of ballast fresh from the pit in Waterloo, CPs 8WWA ballast train crawls over the Crawfish River with two rebuilt SD40s and a SD30C for power. The matching red pops alongside the ... (more)
Fog has settled in the tunnel east of Yale, as dusk turns into night. Lighting up the darkness, CP 8162 wastes no time working through the Fraser Canyon.