In the morning between about 8 and 9 AM, there is shift change at Dongbolizhan. Up to 4 JS steamlocomotives can be seen shunting, taking water and coal, get lubrification by the new staff, before... (more)
There is only very few vegetation in the large open cast coal pit of Sandaoling. Here are some lonely frozen puddles that allow grasses to grow. In the background JS # 6224 is tackling the grade o... (more)
2-8-2 steamlocomotive JS # 8225 with a loaded coal train on the way from the loading point in the pit up to the washery, while JS # 6224 is pushing back her empty train for loading.