The Thanksgiving excursion heads to its run around point at Snelgrove, there it will turn around and head back north to Orangeville.
595 southbound along Stephenson Road 7 in Allensville.
The OBRY approaches the newer diamond in Brampton, where the train will be raised and only the flanges on the axles will make contact with the diamond.
The OBRY heads out of the Vulsay spur after dropping 2 tankers, and picking up 4.
CP crews step aside as the OBRY heads south over the new diamond in Brampton.
OBRY heads southbound crossing Park St. In the foreground there is a section of new track for Railroad St. crossing repairs, which went in along with the new diamond for the Halton Sub Intersectio... (more)
The Southbound OBRY takes its first hit on the new diamond in Brampton, Crawling over it at about 1-3mph.
Realigning the switch is what the conductor on the Orangeville Brampton Railway is doing after setting off 9 cars and lifting 2 on the CPR interchange track in Streetsville.
After a brief stop in Brampton, the OBRY continues south to Streetsville with 4 cars in tow.
595 southbound for Washago, under a few whispy clouds in an otherwise blue sky.
Southbound OBRY crawls over the diamond with a single tanker in tow.
CP work crews step aside after doing work on the diamond to let the local short line pass down their ex-trackage.
The southbound OBRY makes its way through the countryside at about the halfway point of its trip to Streetsville.
OBRY southbound about to cross McLaughlin Rd just outside of Inglewood.