Quiet Sunday at Doswell.
BB 9 sits on the doswell wye with it's cut of cars waitng clearance to get on the main line due to csx movements. Due to the Piedmont SUb being DTC blocks it takes a while before BB can get onto t... (more)
This set of power was inbetween jobs.
Two sets of power rest inbetween jobs at the busy BBRR Yard in Doswell.
Crews are busy replacing signals on the old RF&P. In the picture you can see them working on the signals (left side). A work train with ballast waits to assist in other installations, and a Trash ... (more)
Making up a rather lenghty train is just another days work.
CSX pulling a load past Doswell Switching Yard
PO-89 was delayed slightly waiting on a signal at Doswell. There is a lot of maintenance going on up and down the old RF-P.
A four unit set of power rests in the yard. A colorful lash-up to say the least.
Buckingham Branch power sits in the yard awaiting their next assignment.
These units were awaiting assignment in Doswell, the rear unit was the only one running.
CSX GEVO #5253 leads a FL-bound coal train at Doswell, VA.
Q171 sits stopped at the Doswell signal in Doswell, VA before heading south to Richmond, VA.