DMIR 405 prepares to weigh its train at Highland.
Repainted DM&IR/CN SD40-3 400 leads taconite loads weighing at the Highland scale.
Ore empties behind repainted 400 and 401 north of Two Harbors.
Repainted Missabe tunnel motor 400 leads an unrepainted sister at Highland.
Ore loads southbound for Two Harbors after weighing at Highland.
Missabe 410 bucking snow drifts at Highland.
Kicking up some of the 2+ feet of snow received this week north of Two Harbors.
Slowing for the scale at Highland, en route to Two Harbors.
Northbound ore empties from Two Harbors MN.
Finished weighing, 400 waits for 401 south to arrive, then it will head to Two Harbors.