After a short stop for control/greasing, the 2-8-0 "Consolidation" steamlocomotive G 4/5 # 108 "ENGIADINA" is leaving Cinuos-chel-Brail station with the freight train 9949 for ... (more)
Engineer training run with 2-8-0 "Consolidation" steamlocomotive G 4/5 # 108 of the Rhaetian Railway and 5 freight cars from Samedan to Scuol-Tarasp and back. The train is entering Cinuos-chel-Bra... (more)
Engineer training run with 2-8-0 "Consolidation" steamlocomotive G 4/5 # 108 of the Rhaetian Railway and 5 freight cars from Samedan to Scuol-Tarasp and back. The train is near Cinuos-ch... (more)
The 35 meter high and 137 meter long Schmittentobel Viaduct was built with limestones for the Albula line of the Rhaetian Railway and opened in 1903. In the summer of 2020 it was extensively renov... (more)
2-8-0 "Consolidation" steamlocomotive G 4/5 # 107 "ALBULA" of the Rhaetian Railway is pulling the driver training train 9146 from Filisur to Landquart over the 35 meter high Sc... (more)