Train 220 from Wellington waits in the loop at Feilding. The Main Trunk line between Hamilton and Palmerston North was electrified in 1980s. The EFs were built by Brush Traction, UK in 1986-88 a... (more)
Northern Explorer is the new train between Wellington and Auckland which cover the 680Km/ 420 miles in about 11 hours. It is seen north-bound at Manurewa with only a few miles to go. The DCP is ... (more)
Metro Port train from Tauranga passes through the south Auckland suburbs and soon arrive at Southdown terminal. The DL class is the first new motive power for KiwiRail and the first Chinese built ... (more)
The loco lash up in this scene represents decades of motive power in New Zealand. The DL class is the first Chinese built diesel exported to a western railroad. DFT 7158 started life in 1979 and ... (more)