40. Just over 1600 miles logged in 3 days of my trip so far. Getting close to my furthest points North and West of the trip where I found this remote controlled WAMW locomotive. It doesn't have di... (more)
41. The age of this sign matches the age of this whole area of western Montana. This the third landscape transformation of my trip just in Montana.
42. Western Montana action at it's finest. After this train I will head south on Highway 56 to the Montana Rail Link.
43. Standing on a rock cut right above the tracks.
44. A mighty fine self portrait if you don't mind me saying.
45. The only train I will see on the Montana Rail Link on my 138 mile drive along MRL tracks on day 3 until I get to the Missoula yard. I did see a bunch of signs warning of mountain sheep and lon... (more)
46. Sun has risen just not high enough as my first train of the day heads west towards Missoula. Day 4 has started well all ready. It just won't last.
47. A pan of BNSF 1029 just before it heads in a small tunnel.
48. A lot has happened from comment 47 and this one. I decided to drive up to the west portal of the Mullan Tunnel. Rough snow covered roads led me in. The sun was nowhere near where it needed to ... (more)
49. Do you think they break a lot of knuckles on Mullan Pass?
50. Only saw one train the 123 miles from Helena to Livingston. In Livingston we caught this local job and it's three man crew doing some work.
51. We found out this Micky D's had chocolate dipped ice cream cones. Sweet. Haven't seen one since.
52. All aboard!
53. Great to see all this old power around the Livingston Shops.
54. SD45-2s all day long!