Grafton & Upton 1751 is sporting fresh paint after repairs were made after years on the side line. The GP9R was built as a straight GP9 for the Grand Trunk Western as their 4932 in November, 1958.... (more)
Conrail on the Corridor.
Conrail Shared Assets Operations caboose 22137 brings up the rear of train ME-2 as is passes through Edison Station heading to serve industries on the Northeast... (more)