Extensive maneuvers in Kräbel station with cogwheel steamlocomotive H 2/3 # 17 of the Rigibahnen. Two of the total 5 service cars had to be brought down to Goldau, the other stayed in Kräbel for... (more)
For rock blasting operations in the Kräbelwand the catenary of the Rigibahn had to be dismantled. The work trains for transportation of the material were carried out with the steam locomotive H 2... (more)
For rock blasting operations in the Kräbelwand the catenary of the Rigibahn had to be dismantled. The work trains for transportation of the material were carried out with the steam locomotive H 2... (more)
For rock blasting operations in the Kräbelwand the catenary of the Rigibahn had to be dismantled. The work trains for transportation of the material were carried out with the steam locomotive H 2... (more)