Final adjustments to the #2808, an ex GP49 Alaska Railroad converted to SD49 before entry into service. On one side the next GR12 to be repaired, as Interestingly Ferronor not changed the original... (more)
Controller of #419 at notch 4 because softening coals of the new generator
#423 climbing from Vallenar to Llanos del Soto with 15 loaded vehicles.
The "Tren del Hierro" up from Los Colorados Mine to the port of Huasco. The train is pulled by two locomotives EMD GR-12 but on the stretch of steep slope that is between "Empalme Norte" and "Km 7... (more)
A iron train of Ferronor, pulled by two General Motors GR-12 down the line from Los Colorados to the Port of Huasco. The picture is taken on a brief stop at Empalme Norte. This is meter gauge rail... (more)
"The Iron Train"...
#424 gonig to Vallenar with 33 loaded cars comming from the Los Colorados mine to the port of Huasco.
# 423 climbing to Llanos del Soto yard from Vallenar with 10 vehicles, the original consist was 25 vehicles.