Breitlauenen crossing station of the Schynige Platte Bahn. Locomotive He 2/2 # 19 "Flühblume" was built in 1911 by SLM and Alioth as # 59 for the Wengernalpbahn and came to the Schynige... (more)
On the top of Schynige Platte. Train 648 with locomotive He 2/2 # 11 (built by SLM and BBC in 1914) is leaving down to Wilderswil. In the background He 2/2 # 14 and # 16 with their trains.
This is the very first electric locomotive delivered by SLM and BBC to the Schynige Platte Bahn (SPB) in 1914. Experts believe that the locomotives were delivered in grey at that time, there is no... (more)
Train # 646 of the Schynige Platte Bahn (SPB) is slowly running down the mountain, the pantograph of the electric locomotive He 2/2 # 20 is lowered. The speed of the train is kept constant by the ... (more)
Locomotive No.18 'Gündlischwand' rolls into Breitlauenen to cross an uphill train, and to pick up a couple of passengers. SPB trains generally run with the pantograph lowered in the downhill dire... (more)