Eurocity from Chiasso to Basel has left the Ceneri-Basis-Tunnel (length 15.4 km) and runs to Bellinzona. On the track in the middle and on the left side the trains run to and from Locarno.
"Giruno" RABe 501 # 010 of the SBB, together with another of the same series in multiple control, is crossing the 150 meter long Reuss bridge between Rotkreuz and Oberrüti, running as E... (more)
"Giruno" highspeed train RABe 501 # 011 "Kanton Thurgau" of the SBB is leaving the 57 kilometer long Gotthard Base Tunnel (GBT) at 200 km/h in Rynächt near Erstfeld, running a... (more)
Two highspeed trains "Giruno" of the SBB in multiple control, RABe 501, are running the EC 313 from Zürich to Chiasso, entering the new 15,4 kilometer long Ceneri Base Tunnel (CBT) near... (more)
Above the north portal of the new 15,4 kilometer long Ceneri Base Tunnel (CBT) at Camorino near Giubiasco. Giruno highspeed train RABe 501 # 010 of the SBB is leaving the tunnel and crossing the l... (more)