Because of the quagmire that is Alaska massive quantities of gravel is required in order to build anything. Hence during the construction season the Alaska Railroad runs three gravel trains a day.... (more)
Alaska Railroads first passenger train of the morning is about to cross under the highway to Seward as the train itself makes its way to Seward. Interestingly the railroad is physically shorter th... (more)
UP's Craig local departs Phippsburg with loads for Craig. It will be a non stop trip to Craig where then the local will spend several hours switching the local industries on a very cold second to ... (more)