Pan AM Railways train SALO leaves Everett with a four engine lashup of GP40s. The train is crossing the Mystic River with 27 loads of contaminated soil from the construction site of the new Wynn C... (more)
Pan AM Railways LOSA crosses what used to be known as "Draw 7" on the old Boston & Maine. The train is just short of its destination at the Wynn Casino construction site. The load of 28 empty gond... (more)
After nearly a two hour drill at Lake Junction, MO-1 has their eight car train together with an SW1500 on the West end and a C424 on the East end. The d... (more)
Having completed their work at Kuiken Brothers on the Chester Branch, the MO-1 proceeds Westbound on the High Bridge Branch with two loads for Triumph in Mo... (more)
The latter half of the day for the MO-1 crew was spent delivering two loads to Triumph Plastics in Mount Olive. While Triumph is an active customer, ... (more)