After two days with bad weather and about two feet of snow, Rotary XTm 102 is clearing track No 2. Airolo at the south portal of the 9.3 miles long Gotthard tunnel through the alps is with 1142 m ... (more)
This special high wide train is on it's way to Alberta, but will only make it to Superior for the night. Here the PHNX 102 brings up the rear. The caboose is manned for the trip.